Oops!

It looks like you don't have a flash player installed. Click here to go to the Macromedia download page.

Client: Base Structures (2008)

Grandstand roof

 

An economic cladding system was required for two new grandstand roofs at Sofia Gardens. Pre-stressed flat fabric panels with perimeter boundary cables were installed onto a simple steel cantilever frame. It was essential to provide sufficient slope to the membranes to prevent ponding under snow loads. Tony Hogg Design engineered and detailed the fabric and fittings and provided loads and interface details for the supporting steelwork.

Web Designer