Client: Tensys Consultants (2004)
This landmark project involves two different canopies, the first being a huge triple-conic structure and the second being a barrel vaulted structure forming the roof of the terminal areas. Tony Hogg Design was commissioned alongside Tensys Consultants to produce a tender scheme that contractors would be able to accurately bid against. After the successful contractor was appointed we were appointed by the client as checking engineers.