Client: Architen Landrell (2007)
This structure was commissioned as a replacement to the existing canopy in order to create a larger auditorium space for the summer months' performances. Tony Hogg Design worked with our client to develop a scheme as part of a competition tender. Upon winning this competition we developed the design to completion. All detailing of the structure had to be carried out to ensure the structure was simple to 'demount' for putting into storage over the winter months. The design and construction team had to work under the pressure of an immovable deadline as tickets for the first performances had already been sold in advance.