It looks like you don't have a flash player installed. Click here to go to the Macromedia download page.
Client: Ingenu & Rubb TM (2003)
A fabric cladding system was used to cover the building frame, and plant, of this state-of-the-art waste to energy plant. As the main building frame was developed to suit the plant's process it was necessary to provide a regular grid of secondary steelwork for the fabric cladding. Tony Hogg Design engineered and detailed the secondary steelwork, fabric and fittings and provided full fabrication and patterning information.